Objectives
To direct bridge construction projects for contractors or consultants companies
Education
· B.Sc. Civil Engineering -University of Baghdad – Baghdad- Iraq.1980
Attended training courses
I've attended several national and international training courses.
Technical Training Courses In:
1. Piling Equipments and Techniques/ SoilMec. Piling co. Rome/ Italy May/2004
2. Pile foundation and sheet piling/NCCL/Iraq.
3. Techniques of pre-stressed concrete structures/University of Technology Iraq.
4. Design of common bridges/Cowi Consult/SORB/Iraq.
5. A training course in survey work and road design/SORB/Iraq.
6. Job mix design of asphaltic concrete/ NCCL/Iraq.
7. Non destructive concrete test/ University of Technology Iraq
8. Projects management /NCCL/Iraq
9. Quantity and price estimation for large projects and bridges/SORB/Iraq
10. .Pile construction /Ministry of housing and construction/Iraq.
11. Types of bridges /SORB/Iraq.
1980 - 1985
· Muthana Airport-Baghdad.
· Baghdad international airport-Baghdad.
· Al-Baghdadi Airport-Haditha.
· Air Force Officer’s Club-Baghdad.
Assistant of resident engineer Hammurabi Contracting Company
1985-1987
· Khaldiya Concrete Bridge Project- Alanbar.
· 14th Ramadan Concrete Bridge -Baghdad.
Assistant for project manager Ministry of Housing-SORB
1987-1989
· Radhwaniya Concrete Bridge –Baghdad.
· Concrete bridge for rail way - Abu Graib-Baghdad.
· Three concrete bridges (Arch) in Presidential sites – Baghdad.
· Two concrete bridges on the major drain (Al- Massab Al-AAM)-Baghdad.
· Pedestrian bridge – Ramadi.
· Three steel bridges over Tharthar Canal-Baghdad.
Project manager Hamorabi Contracting Company
1989-1992
· Two concrete bridges for rail way - Beiji.
· Over pass concrete bridge over the main road Baghdad – Mosul in the zone- Beiji.
· Over pass concrete bridge over Beiji / Mosul road- Makhol ( Sinia- Makhol Intersection).
· Large concrete culverts crossing embankment of rail way –Beiji.
Project manager Hammurabi Contracting Company
1993-1996
· Concrete bridge on Tharthar Canal at KM/11
· Concrete Arch bridge in Tikrit in the Presidential site.
· Concrete bridge on Tharthar Canal at KM/19.
· Arch bridge in (Salam Palace) – Baghdad.
Central Batching Plant Manger and Head of Piles Section Hammurabi Contracting Company 1997-2000
Project manager Hammurabi Contracting Company
2001-2003
· Al-A’mara bridge project-Baghdad.
· Zawraa Park Concrete Arch Bridge – Baghdad.
· Project Manager of concrete bridge on site100 (Presidential Site)- Baghdad .
Head of Bridge Department Hamorabi Contracting Company
2004-2007
· Work includes technical and administrative directing and supervising upon bridges projects under construction, quantity and price estimation for projects to be attended by the company, follow up with the time frame schedule of projects, technical and administrative support for all precast concrete elements produced by company including concrete batch plants.
· Projects executed during period are:
· Chabab Bridge - Kut.
· Dejaili & Janabi bridge – Kut.
· Diyala Bridge - Baghdad.
· Shanafiya Bridge –Diwaniya.
· Kefil bridge - Najaf
· Abbasiyat Bridge –Najaf.
· Warrar Bridge - Ramadi.
· Zuhoor Intersection - Baghdad.
· Dakook , Sulaiman Beck, Tooza and Quri Chai bridges – Kirkuk.
· Girders & culverts Plant - Baghdad.
- Resident Engineer-Span for Consultancy Engineering
2008 -2009
· Al-Halfaya Bridge Project- Omdurman/ SUDAN.
skills
Computer skills: M.S Office applications (Word, Excel, Access, PowerPoint…etc.) and internet navigating.
£ Languages: Arabic (mother tongue), English (fluent speak and write).
£ Languages: Arabic (mother tongue), English (fluent speak and write).
No comments:
Post a Comment